Jan. 27, 2019
To readers:
Controversy continues to surround the removal of
4 hydro-electric Klamath dams.
I made several errors in my "Liz Writes Life" column
of January 22, 2019. I am correcting them in my
January 29, 2019 column that will be published in
the Siskiyou Daily News paper located in Yreka, CA.
It will also be posted here on this blog site.
I am posting the following information to
ENCOURAGE everyone to go to the
State Water Resources Control Board site
and read for yourself the
DRAFT Environmental Impact Report released the
end of December and last updated on January 2, 2019
when I copy and pasted the front page with index
to this blog post.
Below is the front page on the
State Water Resources Control Board site
for the Lower Klamath Project --
Draft Environmental Impact Report.
-- Editor Liz Bowen
Lower Klamath Project –
Draft Environmental Impact Report
(EIR)
Deadline to submit comments: 12:00 pm (noon) on February 26, 2019
Information on public meetings, how to submit comments, and where to find hardcopies
of the Draft EIR is available in the Notice of Availability for Public Comment of a
(Released December 27, 2018)
Volume I: Main Text of Draft EIR
Section 3: Environmental Setting, Impacts, and Mitigation Measures (3.1-3.24)
- 3.1 Introduction
- 3.2 Water Quality
- 3.3 Aquatic Resources
- 3.4 Phytoplankton and Periphyton
- 3.5 Terrestrial Resources
- 3.6 Flood Hydrology
- 3.7 Groundwater
- 3.8 Water Supply/Water Rights
- 3.9 Air Quality
- 3.10 Greenhouse Gas Emissions
- 3.11 Geology, Soils, and Minerals
- 3.12 Historical Resources and Tribal Cultural Resources
- 3.13 Paleontologic Resources
- 3.14 Land Use and Planning
- 3.15 Agriculture and Forestry Resources
- 3.16 Population and Housing
- 3.17 Public Services
- 3.18 Utilities and Service Systems
- 3.19 Aesthetics
- 3.20 Recreation
- 3.21 Hazards and Hazardous Materials
- 3.22 Transportation and Traffic
- 3.23 Noise
- 3.24 Cumulative Effects
Section 4: Alternatives (4.1-4.8)
- 4.1 Alternatives Selection/Overview
- 4.2 No Project Alternative
- 4.3 Partial Removal Alternative
- 4.4 Continued Operations with Fish Passage Alternative
- 4.5 Two Dam Removal Alternative
- 4.6 Three Dam Removal Alternative
- 4.7 No Hatchery Alternative
- 4.8 Alternatives References
Volume II: Appendices A – W
- Appendix A - Notice of Preparation and Scoping Report for Lower Klamath Project License Surrender Environmental Impact Report
- Appendix B - Definite Plan
- Appendix C - Water Quality Supporting Technical Information
- Appendix D - Water Quality Environmental Effects Determination Methodology Supplemental Information
- Appendix E - An Analysis of Potential Suspended Sediment Effects on Anadromous Fish in the Klamath Basin
- Appendix F - An Analysis of Potential Bedload Sediment Effects on Anadromous Fish in the Klamath Basin
- Appendix G - Vegetation Communities in the Area of Analysis
- Appendix H - Rare Natural Communities in the Area of Analysis
- Appendix I - Terrestrial Scoping Quadrangles
- Appendix J - Terrestrial Special-Status Plant and Wildlife Scoping List
- Appendix K - Flood Hydrology
- Appendix L - Groundwater
- Appendix M - Water Supply/Water Rights
- Appendix N - Air Quality Impacts
- Appendix O - Greenhouse Gases
- Appendix P - CONFIDENTIAL: Shasta Nation Confidential Tribal Cultural Appendix
- Appendix Q - CONFIDENTIAL: Shasta Indian Nation Confidential Tribal Cultural Appendix
- Appendix R - Aesthetics
- Appendix S - Recreation Supporting Technical Information
- Appendix T - Noise and Vibration Impact Analysis
- Appendix U - Alternatives
- Appendix V - KHSA 2012 EIS/EIR Section 3.12 Tribal Trust
- Appendix W - Additional Information Incorporated by Reference
If you prefer, you may download the entire Draft EIR as: